AI-Ready Liquid Cooling Integrator

Turnkey Electrical + Liquid Cooling Integration for AI Data Centers

From design through commissioning — integrated power delivery, water infrastructure, and fuel-free energy systems for hyperscale, federal, and enterprise facilities.

150 kW
max rack density we co-design
4 → 22
active projects, year 1 to year 3
$45K
blended monthly revenue per project
HQ · Iron Grid Campus
Iron Grid Electric & Water corporate headquarters
Liquid loop temp Δ
12.4°C
01 · The gap

Rosendin runs the conduit.
Cupertino lands the busway.
Holder pours the slab.

Nobody owns what happens between the CDU and the chip. That seam is where most AI deployments fail: thermal interlocks, leak detection, redundancy mismatch, controls drift.

Rosendin Electric
Electrical scope. Stops at the rack PDU.
Cupertino Electric
Power infrastructure. Doesn't own cooling.
Holder / DPR
GC + structural. Subs out the MEP.
Specialty MEP
Cooling-first. Misses the electrical interlock.
Iron Grid Electric & Water
We design the seam. Then we install it.
02 · What we own

Six scopes. One contract. One throat to choke.

01
Power delivery
Medium-voltage to busway, switchgear, UPS lineup, rack PDU.
02
Liquid cooling
Manifold layout, CDUs, immersion tanks, RDHX, secondary loop.
03
Co-design
Power-cooling interlock, thermal sims, redundancy matched N+1.
04
Controls
DCIM, leak-detection trip logic, BMS-to-IT hand-off protocols.
05
Risk & schedule
Lead-time-aware critical path. We won't pretend a CDU ships in 12 weeks.
06
Commissioning
L1-L5 commissioning across both scopes. Single sign-off.
03 · Offer stack

Four business lines. One integrated partner.

A clean stack of services — from GPU-dense data centers to federal SCIF builds to enterprise campus modernization. Designed, installed, and commissioned in-house.

AI Data Center Power + Cooling Integration
Line 01·AI / Hyperscale
AI Data Center Power + Cooling Integration

High-density power distribution (60–150+ kW/rack), liquid cooling electrical integration, busway, switchgear, and commissioning for GPU-intensive facilities.

150 kW
max rack
L1-L5
commissioning
ONSITE Energy Resilience Platform
Line 02·Flagship platform
ONSITE Energy Resilience Platform

Fuel-free permanent magnetic generators via Theron Energy OEM partnership. Zero emissions, EMP-proof, atmospheric water generation. For facilities with aging infrastructure, capital budget pressure, or ESG commitments.

0
fuel inputs
20+ yr
design life
Federal & DoD Infrastructure
Line 03·Federal & DoD
Federal & DoD Infrastructure

SCIF-rated builds, government facility electrical and water systems, NDAA / TAA / Buy American compliant, security clearance ready.

SCIF
rated
NDAA · TAA · BABA
compliant
Enterprise Campus Modernization
Line 04·Enterprise
Enterprise Campus Modernization

Full-scope electrical and water upgrades for corporate campuses, hospitals, universities, and industrial facilities.

Brownfield
specialist
48 hr
scoping
04 · The branded turnkey platform
Iron Grid · Flagship product

The ONSITE Platform

The complete infrastructure solution for energy advisory conversations.

The ONSITE Platform belongs in every energy advisory conversation where the client has aging infrastructure, a capital budget under pressure, or ESG commitments that need structural backing.

It combines Iron Grid's electrical and water infrastructure expertise with Theron Energy's fuel-free power generation into a single, repeatable, turnkey solution.

Trigger
01

Aging Infrastructure

Facilities running outdated electrical systems face rising maintenance costs, compliance gaps, and operational risk. The ONSITE Platform replaces legacy power and water systems with modern, fuel-free, zero-emission infrastructure designed for 20+ year lifecycles.

20+ yr
Designed lifecycle
Trigger
02

Capital Budget Pressure

When budgets are tight, the ONSITE Platform delivers integrated electrical, water, and power generation in a single contract scope — eliminating the cost overruns of coordinating 4–7 separate subcontractors and reducing total project cost by consolidating design, procurement, and commissioning.

1 → 7
Subs collapsed
Trigger
03

ESG Commitments

Organizations with sustainability mandates need more than carbon offsets. The ONSITE Platform provides structural ESG backing: zero-emission permanent magnetic generators, atmospheric water generation, and infrastructure that eliminates fuel dependency entirely — measurable, auditable, and permanent.

0
Fuel inputs · zero emission
The bottom line
One platform.One partner.Complete energy resilience.

A single contract, a single integrator, and a single sign-off across power generation, electrical distribution, and water — packaged for the energy advisory deal you're already in.

05 · The integration layer

Watts in, heat out — interlocked by design.

Every kilowatt that enters a rack must leave as heat in the loop within the same second. Legacy contractors treat that as two contracts. We treat it as one physical system.

12.4°C
Δ supply / return
45°C
GPU junction max
N+1
loop redundancy
< 80 ms
leak-trip interlock
POWER · 480V
W1/W2 · 22°C
150 kW
rack
Switchgear · UPS · Busway
CDU · Manifold · Direct-to-Chip
06 · Strategic partner
Theron Energy · exclusive integrator

Fuel-free, container-shipped, grid-independent power.

We are the integration partner for Theron Energy permanent-magnet generators — 40-ft ISO-container units that drop on a pad and close the gap between utility interconnect timelines and AI compute demand.

0
fuel inputs
40 ft
ISO container
< 12 wk
to energized
N+1
redundancy
Theron · Containerized PMG
Theron Energy containerized fuel-free permanent magnet generators
Continuous output
2.4 MW
per container · scalable in parallel
07 · Field

The build is loud. The integration is quiet.

Inside the platform
Hyperscale Build · Hillsboro
Project · 01
Hyperscale Build · Hillsboro
Direct-to-chip · 80 kW/rack
Federal AI Lab · Oak Ridge
Project · 02
Federal AI Lab · Oak Ridge
Immersion · 120 kW/rack
Colo Retrofit · Ashburn
Project · 03
Colo Retrofit · Ashburn
Hybrid · 60-90 kW/rack
08 · Bench

We're embedded with the OEMs that ship the kit.

Pre-engineered against Vertiv, Schneider, CoolIT, Motivair, and the cooling skids that actually meet AI-cluster lead times.

Vertiv ·Schneider Electric ·CoolIT Systems ·Motivair ·ABB ·Eaton ·Submer ·GRC ·nVent ·Vertiv ·Schneider Electric ·CoolIT Systems ·Motivair ·ABB ·Eaton ·Submer ·GRC ·nVent ·
09 · Contact

Spinning up a
100+ kW/rack build?

Talk directly to the team. Phone, email, or a 30-minute scoping call — we'll come back with a fit assessment inside 48 hours.

Service areas
Arizona
State
New Mexico
State · HQ
Texas
State
Nationwide
Federal · DoD

Cleared crews · mobilized within 72 hours

Credentials & compliance
Licensed & Bonded|Security Clearance Ready|IEEE Member|NEC / NFPA Compliant|UL Listed Equipment